Flood Dose System

Friction Loss / Drain back Worksheet for 2" dia. and 3" dia. PVC Sch 40


Contact Information

First Name:
Last Name:
Street Address:
City:
State:
Zip Code:
E-Mail Address:
Phone Number(s):
Fax Number:

General Directions

First: Pick the type of system - Flood Dose or Pressure Distribution

Second: Fill in all required fields by using the Tab key to move down the page.  Refer to the pump curves page for a sampling of available effluent/sewage pumps or see your local dealer.

Third: When completed, click the submit button.  You will then be directed to a secure server for payment ($30 fee).  Your calculated friction loss will be e-mailed to you within 24 Hours of payment.

This worksheet assumes that you are going to use the same pipe diameter throughout the delivery line (including all fittings).

Please read our privacy statement


Click here to see Pumps Curves

Length of Delivery line in feet: Feet
General Rule: Pumping <60 GPM- 2" delivery line
Pumping >60 GPM- 3" delivery line
Diameter of Delivery Line:
Static lift: Feet The static lift is figured by subtracting the pump's proposed off float elevation from the invert elevation of the D-box inlet.
Gallons per/minute at static Lift: G.P.M. Next, take this static lift and find a pump that will deliver your target Gallons/Minute at that static lift.
List the number of fittings in the delivery
line between the pump and the D-Box:
90º Elbows:
45º Elbows:
Tee Thru-Flow:
Tee Branch Flow:
Swing Check Valve:
Example: Using Myers ME 3F
This pump will deliver 60 GPM at 9 feet of static lift.